VEVOR US EN
Select the country/region, language, and currency you prefer for shopping.
Delivery to
Your Address
Hello, Sign in
Account & Order
Categories
Download VEVOR App
Exclusive $5.00 off for your first three orders on the App.
Scan the QR code to download
VEVOR Ground Grid, 1885 lbs per Sq Ft Load Geo Grid, 2" Depth Permeable Stabilization System for DIY Patio, Walkway, Shed Base, Light Vehicle Driveway, Parking Lot, Grass, and Gravel

VEVOR Ground Grid, 1885 lbs per Sq Ft Load Geo Grid, 2" Depth Permeable Stabilization System for DIY Patio, Walkway, Shed Base, Light Vehicle Driveway, Parking Lot, Grass, and Gravel

2 inch 27 x 4 ft
Questions and Answers
26 Questions
What is the recommended anchor when filling with loose gravel? How many anchors per 27x4 unit?
This can be fixed with rebar. The edges are fixed with one anchor for each grid, and one for every 1-2 square meters in the middle.
By vevor
What is recommended when installing the 2inch grids for an area of grass that car tires drive over? How much gravel and how much soil so grass can grown?
Just backfill the soil about 5cm higher than the product.
By vevor
Can this be used as a base in horse stalls
Yes.
By vevor
I will use this with compacted stone dust, with mats on top in horse stalls, so my top surface needs to be very flat and uniform. 1. How flat does the clay base need to be before I stake out the grid? 2. How much cover do I need over the grid? 3. I can wet and compact the stone dust in the grid, correct? Thank you!
If the foundation flatness cannot be too uneven, you can wet the stone powder and flatten it. A minimum of 0.5 cubic meters of filler is required to cover one product.
By vevor
Can it be filled with wet concrete
Yes.
By vevor