All
All
Abrasive & Sand Blasters
Decor & Furniture
Doors & Windows
Health & Wellness
Home Decor
Meat Choppers & Meat Grinders
Pet Supplies
Sports & Recreation
Agriculture & Forestry Equipment
Air Tools & Compressors
Alternative & Renewable Energy
Arts & Crafts & Sewing
Automotive
Building & Construction
Cleaning & Janitorial Supplies
Electrical
Engines & Motors
Generators
Hand Tools
Hardware
Heating & Cooling
Hydraulics
Lab
Lawn & Garden
Lighting
Machining
Material Handling
Office Supplies
Painting
Plumbing
Power Tools
Pumps
Restaurant & Food Service
Safety
Security
Tool Storage & Organization
Welding
Other
EN
Select the country/region, language, and currency you prefer for shopping.
Country Website
Language
Currency
Submit
Delivery to
Your Address
Hello, Sign in
Account & Order
Categories
Deals
Bulk Savings
Best Sellers
Clearance
Inspiration
DIY Projects & Ideas
Member Club
Product Recall
Download VEVOR App
Exclusive
$5.00
off for your first three orders on the App.
Scan the QR code to download
Home
Safety
Search for "
safe work method statement
"
Confined Space Entry Systems
Personal Protective Equipment
Water Safety
Eye Protection
15 Results
Sort by:
Popular
Popular
Price from Low to High
Price from High to Low
Hot
New
Categories
Safety
Confined Space Entry Systems
Personal Protective Equipment
Water Safety
Eye Protection
Price Discounts
On Sale
Bulk Savings
Stars
5 stars only
4 stars and up
3 stars and up
2 stars and up
1 star and up
Price
Go
Under
30
30
~
50
50
~
100
100
~
200
200
~
500
500
&
Above
In Stock
Quick look
Work Gloves 12 Pairs Touch Screen Nitrile-Coated Garden Construction Gloves
18.9
18.9
Deal after registering
Member discounted price
0% cash back
at checkout.
Save 10%
on 3 select item(s)
18.9
Non-PRO Account
Save 10%
on 3 select item(s)
18.9
Save
Non-PRO Account
Save 10%
on 3 select item(s)
In Stock.
Add to Cart
Quick look
VEVOR High Visibility Reflective Safety Jacket, Waterproof Safety Hoodie, Work Construction Coat with Pockets for Men & Women, Rain Gear Meet ANSI & Class 3, Hi Vis Yellow Coat with Black Bottom, L
(26)
25.9
25.9
Deal after registering
Member discounted price
0% cash back
at checkout.
25.9
Non-PRO Account
25.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Ear Plugs for Sleeping Noise Cancelling, NRR 25 dB Reusable High Noise Reduction Earplugs, Flexible Silicone Soft Earplug with 12 Ear Tips in M / L, for Sleeping, Working, Studying & Traveling
(15)
6.9
10.9
Deal after registering
Member discounted price
0% cash back
at checkout.
6.9
Non-PRO Account
6.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Respirator Mask, Reusable Half Face Cover with Safety Glasses and Filters, Organic Vapor Mask and Dust-proof Face Cover, for Painting, Polishing, Welding, Woodworking and Other Work Protection
(38)
13.9
13.9
Deal after registering
Member discounted price
0% cash back
at checkout.
Save 10%
on 3 select item(s)
13.9
Non-PRO Account
Save 10%
on 3 select item(s)
13.9
Save
Non-PRO Account
Save 10%
on 3 select item(s)
In Stock.
Add to Cart
Quick look
VEVOR Safety Glasses, Anti-Fog and Scratch-Resistant Clear Lens, Safety Goggles with Adjustable Length and Angle, ANSI Z87.1+ Impact-Resistant Protective Eye Goggles, for Work, Lab & Construction
(14)
8.9
10.99
Deal after registering
Member discounted price
0% cash back
at checkout.
8.9
Non-PRO Account
8.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Safety Vest, 10 Pockets Yellow Safety Vest, Hi Vis Zipper Front Safety Vest with Reflective Strips, High Visibility Work Construction Vest with Pockets and Walkie-Talkie Clip, for Men & Woman
(18)
17.9
19.9
Deal after registering
Member discounted price
0% cash back
at checkout.
17.9
Non-PRO Account
17.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Safety Glasses, Anti-Fog and Scratch-Resistant Clear Lens, Over Eyeglasses Safety Goggles with Adjustable Elastic Headband, ANSI Z87.1+ Protective Eye Goggles, for Work, Lab and Construction
(16)
11.99
11.99
Deal after registering
Member discounted price
0% cash back
at checkout.
Save 10%
on 3 select item(s)
11.99
Non-PRO Account
Save 10%
on 3 select item(s)
11.99
Save
Non-PRO Account
Save 10%
on 3 select item(s)
In Stock.
Add to Cart
Quick look
VEVOR Safety Vest, 10 Pockets Yellow Safety Vest, High Visibility Zipper Front Safety Vest with Reflective Strips, Hi Vis Work Construction Vest with Pockets and Walkie-Talkie Clip, for Men & Woman
(18)
10.9
20.9
Deal after registering
Member discounted price
0% cash back
at checkout.
10.9
Non-PRO Account
10.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Safety Earmuffs, Electronic Ear Muffs with 5.3 Bluetooth Technology and Sound Amplification, Noise Reduction Headphone NRR23dB, Hearing Protection Earmuffs for Shooting, Lawn Mowing and Work
(27)
31.9
31.9
Deal after registering
Member discounted price
0% cash back
at checkout.
Save 10%
on 3 select item(s)
31.9
Non-PRO Account
Save 10%
on 3 select item(s)
31.9
Save
Non-PRO Account
Save 10%
on 3 select item(s)
In Stock.
Add to Cart
Quick look
VEVOR Confined Space Tripod Kit, Heavy Duty Rescue Tripod Lifting Hoist 1800 lbs Winch, 4.1 ft Adjustable Legs, 65 ft Cable Portable Kit, 32.8 ft Fall Protection, 4.40-7.05 ft Working Height
307.99
307.99
Deal after registering
Member discounted price
0% cash back
at checkout.
307.99
Non-PRO Account
307.99
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
Quick look
VEVOR Confined Space Tripod Kit, Heavy Duty Rescue Tripod Lifting Hoist 2600 lbs Winch, 4.76 ft Adjustable Legs, 98.5 ft Cable Portable Kit, 32.8 ft Fall Protection, 5.25-8.04 ft Working Height
334.99
334.99
Deal after registering
Member discounted price
0% cash back
at checkout.
334.99
Non-PRO Account
334.99
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
Quick look
VEVOR Respirator Mask, Reusable Respirator Full Face Gas Cover with Filters, Organic Vapor Mask and Dust-proof Face Cover, for Painting, Polishing, Welding, Woodworking and Other Work Protection
(26)
17.9
24.99
Deal after registering
Member discounted price
0% cash back
at checkout.
17.9
Non-PRO Account
17.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR High Visibility Reflective Safety Jacket, Waterproof Winter Hoodie, Work Construction Coat with Pockets for Men & Women, Rain Gear Meet ANSI & Class 3, Hi Vis Yellow Coat with Black Bottom, L
(29)
35.9
26.99
Deal after registering
Member discounted price
0% cash back
at checkout.
35.9
Non-PRO Account
35.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Confined Space Tripod Kit, Heavy Duty Rescue Tripod Lifting Hoist 1200 lbs Winch, 4.1 ft Adjustable Legs, 65 ft Cable Portable Kit, 32.8 ft Fall Protection, 4.40-7.05 ft Working Height
282.99
282.99
Deal after registering
Member discounted price
0% cash back
at checkout.
282.99
Non-PRO Account
282.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Confined Space Tripod Kit, Heavy Duty Rescue Tripod Lifting Hoist 1200 lbs Winch, 4.1 ft Adjustable Legs, 98.5 ft Cable Portable Kit, 32.8 ft Fall Protection, 4.40-7.05 ft Working Height
284.99
284.99
Deal after registering
Member discounted price
0% cash back
at checkout.
284.99
Non-PRO Account
284.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
1
You May Also Like
Today's Deals For You
Recently Viewed
Recommended Searches
rope come along
the rope
laminate cabinet doors
steel rope cable
wire steel rope
outdoor postbox
steel rope suppliers
steel rope fittings
steel cable wire rope
display cabinet led
towing with rope
commercial washer
wire rope fittings
wire rope and fittings
small portable washer
rope for barriers
rope barrier
heavy duty washer
commercial power washers
sink washer